Assessment
First the processes in scope, then the trace and the gap for each. After the assessment, each row shows its level. The gap opens the work product and the steps for the next level. Work already done and work still to do are on the register. The level is written when the assessment finishes. Capability levels state what each level requires.
In scope
| Process | Trace | Gap | Level |
|---|---|---|---|
| SWE.1 | Software requirements | Review record | pending |
| SWE.2 | Architecture | Review record | pending |
| SWE.3 | Middleware packages | Review record | pending |
| SWE.4 | Library cases · SIL-EM-01 | Verification record | pending |
| SWE.5 | Integration scenes | Component-verification record | pending |
| SWE.6 | Trace | Verification result: SIL-SM-01 to be refreshed, SG-05 open | pending |
| SUP.8 | Git baseline | Configuration-management plan and configuration-status account | pending |
| SUP.9 | Fix commits | Problem record | pending |
| SUP.10 | Commits on main | Change request | pending |
| MAN.3 | Phase table | Estimate and deviation | pending |
| MAN.5 | Five risks | Risk record | pending |
| ACQ.4 | Upstream libraries | Supplier-evaluation record | pending |
| SPL.2 | L3 release script | Release record | pending |
| PIM.3 | Devops commits | Process-improvement record | pending |
Out of this pass
SUP.1 has no check of the process independent of development. MAN.6 has no process measurement. REU.2 has no reuse catalog. SUP.11, VAL.1, and SYS.1 through SYS.5 have no trace to open. The four hardware processes and the four machine-learning processes wait for a hardware manual and for the application algorithms. Those processes are not in the table, and they are not given a level.