Automotive SPICE 4.0 · Process trace
Capability levels
An assessment assigns each process in the agreed scope its own level, from 0 to 5. “Level 2” means every process in that scope has reached 2. The processes in this pass are at 0. This page states what each level requires.
What 0 through 5 ask
| Level | The question | What this repository can say |
|---|---|---|
| 0 | The process purpose is not achieved | A white box stops here. With no reading page, there is no result to discuss |
| 1 | The purpose is achieved, and the work product exists | An opened process has only reached “there is a trace.” An incomplete trace cannot be called level 1 |
| 2 | The work is planned and tracked, and the work products are controlled | There is no process plan and no tracking record. Git only answers which commit a configuration item is |
| 3 | The organization has a defined process, and the project follows it | There is no organizational process definition |
| 4 | Data is used to predict and control | There is no process measurement. A product-gate result is not a process measurement |
| 5 | Improvement keeps the process changing | Without level 4, level 5 has no basis |
Processes that already open
Each row names the trace that exists, and what is still missing before level 1 can even be discussed. Level 2 and above are not spelled out row by row: none of these processes has a plan or a tracking record.
| Process | Trace that exists | Still missing before level 1 |
|---|---|---|
| SWE.1 | Software requirements. They serve the safety goals. The goals are not the requirements | A record that these requirements were reviewed and accepted |
| SWE.2 | Architecture | A record that the architecture was reviewed and accepted |
| SWE.3 | Middleware packages | A record that the detailed design was reviewed |
| SWE.4 | EM, OSAL, PHM, SM, Collector, and SIL-EM-01 | A record that these cases cover the detailed design |
| SWE.5 | SIL-EM-02, SIL-03, SIL-SM-01, SIL-01, SIL-06 | There is no component verification against the architecture. Only part of the purpose is achieved |
| SWE.6 | Trace. SIL-T4 answers SR-05. SIL-02 is the main-chain check | SIL-SM-01 is still to be refreshed, and SG-05 remains open. This is not recorded as fully passed |
| SUP.8 | Git baseline | A configuration-management plan and a status account. At present it only identifies which commit |
| SUP.9 | Fix commits | A problem ticket, a cause, and a status. At present there is only the closing commit |
| SUP.10 | Commits on main | A change request and an approval. At present there is only the commit on main |
| MAN.3 | Phase table and the commit list | An estimate and a deviation log |
| MAN.5 | Five risks and their treatments | An owner and a review date |
| ACQ.4 | Upstream libraries, the list and one evaluation draft | A periodic check of the suppliers |
| SPL.2 | The L3 release script | One release that was tagged and handed off. The CD script still only prints paths |
| PIM.3 | Devops commits record changes to the gate rules | An improvement that came from a check or a measurement. At present a rule change is committed, and the improvement does not come from either |
White boxes stop at the question of level 0
SUP.1 has no check of the process that is independent of development. MAN.6 has no process measurement, so levels 4 and 5 have no input. REU.2 has no reuse catalog. SUP.11, VAL.1, and SYS.1 through SYS.5 have no trace to open. The four hardware processes and the four machine-learning processes wait for a hardware manual and for the application algorithms.
This page does not assess SYS for the vehicle item, and it does not assess hardware or machine learning. The assessment records the scope and the gaps for this pass. The processes in this pass are at 0.
What would have to come first
In this order. No dates.
- Finish the part of each opened process whose purpose is not yet achieved. That is the condition for discussing level 1.
- Give each process that would enter the scope a plan and one tracking pass, and keep its work products on a baseline. That is the condition for discussing level 2.
- Levels 4 and 5 are not taken up yet. Until MAN.6 has a process measurement, those two levels have no input.