Automotive SPICE 4.0 · Process trace
ACQ.4 · Supplier monitoring
This stands at 0. The next step is a supplier-evaluation record. The trace already here: Upstream libraries
Back to the assessment · Register
0 · Now
- The list of upstream libraries and one evaluation draft are already on the reading page.
- There is no supplier-evaluation record that states which library this round evaluated, what was evaluated, and the conclusion.
- The purpose of this level is not achieved. The level is 0.
Supplier-evaluation record
| Supplier | Content of the evaluation | Conclusion | Identifier of the record |
|---|---|---|---|
| No record yet | |||
This table has no record yet. The next section is how to establish it. Register this table
1 · Next
- Select the libraries for this round from the list, one library per row. A library not selected is not listed.
- The content of the evaluation is something that can be checked: whether the version is pinned, whether the license was read, whether the board build is from source.
- The conclusion is Continue to use, or Action required. Action required names the action.
- The evaluation record is placed under one configuration identifier. A row whose conclusion is Action required points at the later change, or says there is no change yet.
Supplier-evaluation record
| Supplier | Content of the evaluation | Conclusion | Identifier of the record |
|---|---|---|---|
| No record yet | |||
This table has no record yet. The steps in this section say how to fill it. Register this table
2
- The evaluation plan names the suppliers for the next round, the content of this round, and where the record lives.
- The tracking record states whether each planned library was evaluated, and the conclusion.
- The supplier-evaluation record goes on the baseline.
Evaluation plan
| Supplier | Content of this round | Where the record lives |
|---|---|---|
| No record yet | ||
This table has no record yet. The steps in this section say how to fill it. Register this table
Tracking record
| Supplier | Evaluated | Conclusion |
|---|---|---|
| No record yet | ||
This table has no record yet. The steps in this section say how to fill it. Register this table
Baseline
| Supplier-evaluation record | Baseline identifier |
|---|---|
| No record yet | |
This table has no record yet. The steps in this section say how to fill it. Register this table
3
- Write the procedure for supplier evaluation, one entry at a time, including the completion criterion.
- For each entry, write how this item implements it.
- A nonconformity is its own row. A change to the procedure or to the implementation is another row, with its configuration identifier.
- The procedure and the conformity comparison share one configuration identifier.
Conformity comparison
| Procedure entry | Implementation on this item | Conformity | Identifier of the comparison |
|---|---|---|---|
| No record yet | |||
This table has no record yet. The steps in this section say how to fill it. Register this table
4
- Measurement comes from MAN.6. MAN.6 is outside this pass, so the table below stays blank.
- Before the work, write the expected result of supplier evaluation.
- After the work, write the actual result.
- When the result drifts, write the adjustment and its configuration identifier.
- A product-gate result is not entered in this table.
Process measurement
| Expected result | Actual result | Drift | Identifier of the adjustment |
|---|---|---|---|
| — | — | — | — |
The cells stay blank. Process measurement comes from MAN.6, which is outside this pass. Register this table
5
- Take one drift from the level-4 process measurement.
- Change the procedure entry that corresponds to that drift.
- Name the measurement the change rests on.
- The changed procedure stays on the baseline and cites that measurement.
Procedure change
| Procedure entry changed | Measurement | Change | Identifier of the change |
|---|---|---|---|
| — | — | — | — |
The cells stay blank. Level 4 has no measurement, so this level has no record to rest on. Register this table