Automotive SPICE 4.0 · Process trace
SWE.1 · Software requirements
This stands at 0. The next step is a review record. The trace already here: Software requirements
Back to the assessment · Register
0 · Now
- The software requirements already have a reading page. A requirement identifier points at an entry.
- There is no review record: no configuration identifier of the reviewed version, no reviewer independent of the author, no review result, and no finding.
- The purpose of this level is not achieved. The level is 0.
Review record
| Review object | Configuration identifier | Reviewer | Review result | Finding | Identifier of the record |
|---|---|---|---|---|---|
| No record yet | |||||
This table has no record yet. The next section is how to establish it. Register this table
1 · Next
- Identify the {'html': '<a href="../fusa/requirements.html#sr-03">SR-03</a>'} under review and its configuration identifier. The review applies to that identifier.
- The reviewer is independent of the author.
- The review result is Accepted, Accepted with comments, or Rejected. Rejected and Accepted with comments record a finding and point at the affected entry.
- After a finding is closed, review again. The new result is appended on the same review record. The earlier result stays.
- The review record and the reviewed version share one configuration identifier.
Review record
| Review object | Configuration identifier | Reviewer | Review result | Finding | Identifier of the record |
|---|---|---|---|---|---|
| No record yet | |||||
This table has no record yet. The steps in this section say how to fill it. Register this table
2
- Establish the review plan, complete one tracking record, then place Accepted and Accepted-with-comments entries on the baseline. All three records are required.
- The review plan names the configuration identifier, the reviewer, and where the review record will be stored. A date is entered when it is set.
- The tracking record states whether this pass is not reviewed or reviewed, and the review result.
- Accepted and Accepted-with-comments entries go on the baseline, with the baseline identifier. Findings on Accepted with comments stay open.
Review plan
| Review object | Configuration identifier | Reviewer | Identifier of the record |
|---|---|---|---|
| No record yet | |||
This table has no record yet. The steps in this section say how to fill it. Register this table
Tracking record
| Configuration identifier | Review status | Review result |
|---|---|---|
| No record yet | ||
This table has no record yet. The steps in this section say how to fill it. Register this table
Baseline
| Requirement identifier | Review result | Baseline identifier |
|---|---|---|
| No record yet | ||
This table has no record yet. The steps in this section say how to fill it. Register this table
3
- Write the procedure for the software-requirements review, one entry at a time, including the completion criterion.
- For each entry, write how this item implements it.
- A nonconformity is its own row. A change to the procedure or to the implementation is another row, with its configuration identifier.
- The procedure and the conformity comparison share one configuration identifier.
Conformity comparison
| Procedure entry | Implementation on this item | Conformity | Identifier of the comparison |
|---|---|---|---|
| No record yet | |||
This table has no record yet. The steps in this section say how to fill it. Register this table
4
- Measurement comes from MAN.6. MAN.6 is outside this pass, so the table below stays blank.
- Before the work, write the expected result of the software-requirements review.
- After the work, write the actual result.
- When the result drifts, write the adjustment and its configuration identifier.
- A product-gate result is not entered in this table.
Process measurement
| Expected result | Actual result | Drift | Identifier of the adjustment |
|---|---|---|---|
| — | — | — | — |
The cells stay blank. Process measurement comes from MAN.6, which is outside this pass. Register this table
5
- Take one drift from the level-4 process measurement.
- Change the procedure entry that corresponds to that drift.
- Name the measurement the change rests on.
- The changed procedure stays on the baseline and cites that measurement.
Procedure change
| Procedure entry changed | Measurement | Change | Identifier of the change |
|---|---|---|---|
| — | — | — | — |
The cells stay blank. Level 4 has no measurement, so this level has no record to rest on. Register this table