中文

Automotive SPICE 4.0 · Process trace

SUP.9 · Problem resolution

This stands at 0. The next step is a problem record. The trace already here: Fix commits

Back to the assessment · Register

0 1 2 3 4 5

0 · Now

  1. Closing a problem can currently be pointed at a commit whose message says fix.
  2. There is no problem record that states a problem identifier, a cause, and a status.
  3. The purpose of this level is not achieved. The level is 0.

Problem record

Problem identifierCauseStatusIdentifier at closure
No record yet

This table has no record yet. The next section is how to establish it. Register this table

1 · Next

  1. One problem is one row.
  2. The cause is the condition that led to the problem. An unknown cause is written Unknown.
  3. Status is Open, In progress, or Closed. A Closed row names the identifier at closure, and that commit message matches this problem.
  4. A status change stays on the same problem record. The earlier status stays.

Problem record

Problem identifierCauseStatusIdentifier at closure
No record yet

This table has no record yet. The steps in this section say how to fill it. Register this table

2

  1. The problem-resolution plan names where the record lives, which role may set a status to Closed, and what a Closed row points at.
  2. The tracking record checks whether each row's status matches a commit in the repository.
  3. A problem record that matches goes on the baseline.

Problem-resolution plan

Where the record livesWho may closeWhat closure points at
No record yet

This table has no record yet. The steps in this section say how to fill it. Register this table

Tracking record

Problem identifierStatus matches the commitConfiguration identifier
No record yet

This table has no record yet. The steps in this section say how to fill it. Register this table

Baseline

Problem recordBaseline identifier
No record yet

This table has no record yet. The steps in this section say how to fill it. Register this table

3

  1. Write the procedure for problem records, one entry at a time, including the completion criterion.
  2. For each entry, write how this item implements it.
  3. A nonconformity is its own row. A change to the procedure or to the implementation is another row, with its configuration identifier.
  4. The procedure and the conformity comparison share one configuration identifier.

Conformity comparison

Procedure entryImplementation on this itemConformityIdentifier of the comparison
No record yet

This table has no record yet. The steps in this section say how to fill it. Register this table

4

  1. Measurement comes from MAN.6. MAN.6 is outside this pass, so the table below stays blank.
  2. Before the work, write the expected result of problem records.
  3. After the work, write the actual result.
  4. When the result drifts, write the adjustment and its configuration identifier.
  5. A product-gate result is not entered in this table.

Process measurement

Expected resultActual resultDriftIdentifier of the adjustment
————

The cells stay blank. Process measurement comes from MAN.6, which is outside this pass. Register this table

5

  1. Take one drift from the level-4 process measurement.
  2. Change the procedure entry that corresponds to that drift.
  3. Name the measurement the change rests on.
  4. The changed procedure stays on the baseline and cites that measurement.

Procedure change

Procedure entry changedMeasurementChangeIdentifier of the change
————

The cells stay blank. Level 4 has no measurement, so this level has no record to rest on. Register this table