Automotive SPICE 4.0 · process trace
The engineering V
The nineteen engineering processes form the V. Supporting, management, and acquisition are arranged below the V, in their process groups. A filled process can be opened, and its color is the process group. A white box is drawn only. This page is used alongside functional safety. The safety conclusion stays on FuSa.
VAL.1Validation
SYS.2System req.
SYS.5System verif.
SYS.3System arch.
SYS.4System integ.
Supporting
Management
Acquisition, supply, improvement, reuse
Two plug-ins on the system
This item is platform software. Both plug-ins stay on the drawing.
HWE.1HW requirements
HWE.4Against req.
HWE.2HW design
HWE.3Against design
The properties to provide are on hardware. They are not these four processes.
MLE.1ML requirements
MLE.4Model test
MLE.2ML architecture
MLE.3Training
Application algorithms are written later. They are not these four processes.