Automotive SPICE 4.0 · Process trace

MAN.3 · Project management

This stands at 0. The next step is an estimate and a deviation. The trace already here: Phase table

Back to the assessment · Register

0 1 2 3 4 5

0 · Now

  1. The phase table is in place. P0 through P2.5 are closed. P3 is in progress.
  2. There is no estimate, and no deviation written when a phase ends.
  3. The purpose of this level is not achieved. The level is 0.

Estimate and deviation

PhaseEstimateActualDeviation
No record yet

This table has no record yet. The next section is how to establish it. Register this table

1 · Next

  1. Each phase is one row, including phases that have already closed.
  2. The estimate states what the phase was set to finish. Headcount and days are entered only when that statement already existed.
  3. The actual states what was finished when the phase closed. A phase that has not closed says In progress.
  4. The deviation states where actual and estimate differ. No difference is written as no difference. A row filled after the fact says so in the deviation.

Estimate and deviation

PhaseEstimateActualDeviation
No record yet

This table has no record yet. The steps in this section say how to fill it. Register this table

2

  1. The plan names where estimates are recorded, who records the deviation, and when it is recorded.
  2. The tracking record checks whether every closed phase has a deviation row.
  3. The estimate and deviation go on the baseline.

Plan

Where the estimate is recordedWho records the deviationWhen it is recorded
No record yet

This table has no record yet. The steps in this section say how to fill it. Register this table

Tracking record

PhaseDeviation row presentDeviation
No record yet

This table has no record yet. The steps in this section say how to fill it. Register this table

Baseline

Estimate and deviationBaseline identifier
No record yet

This table has no record yet. The steps in this section say how to fill it. Register this table

3

  1. Write the procedure for phase estimates, one entry at a time, including the completion criterion.
  2. For each entry, write how this item implements it.
  3. A nonconformity is its own row. A change to the procedure or to the implementation is another row, with its configuration identifier.
  4. The procedure and the conformity comparison share one configuration identifier.

Conformity comparison

Procedure entryImplementation on this itemConformityIdentifier of the comparison
No record yet

This table has no record yet. The steps in this section say how to fill it. Register this table

4

  1. Measurement comes from MAN.6. MAN.6 is outside this pass, so the table below stays blank.
  2. Before the work, write the expected result of phase estimates.
  3. After the work, write the actual result.
  4. When the result drifts, write the adjustment and its configuration identifier.
  5. A product-gate result is not entered in this table.

Process measurement

Expected resultActual resultDriftIdentifier of the adjustment
————

The cells stay blank. Process measurement comes from MAN.6, which is outside this pass. Register this table

5

  1. Take one drift from the level-4 process measurement.
  2. Change the procedure entry that corresponds to that drift.
  3. Name the measurement the change rests on.
  4. The changed procedure stays on the baseline and cites that measurement.

Procedure change

Procedure entry changedMeasurementChangeIdentifier of the change
————

The cells stay blank. Level 4 has no measurement, so this level has no record to rest on. Register this table