Automotive SPICE 4.0 · Process trace
MAN.3 · Project management
This stands at 0. The next step is an estimate and a deviation. The trace already here: Phase table
Back to the assessment · Register
0 · Now
- The phase table is in place. P0 through P2.5 are closed. P3 is in progress.
- There is no estimate, and no deviation written when a phase ends.
- The purpose of this level is not achieved. The level is 0.
Estimate and deviation
| Phase | Estimate | Actual | Deviation |
|---|---|---|---|
| No record yet | |||
This table has no record yet. The next section is how to establish it. Register this table
1 · Next
- Each phase is one row, including phases that have already closed.
- The estimate states what the phase was set to finish. Headcount and days are entered only when that statement already existed.
- The actual states what was finished when the phase closed. A phase that has not closed says In progress.
- The deviation states where actual and estimate differ. No difference is written as no difference. A row filled after the fact says so in the deviation.
Estimate and deviation
| Phase | Estimate | Actual | Deviation |
|---|---|---|---|
| No record yet | |||
This table has no record yet. The steps in this section say how to fill it. Register this table
2
- The plan names where estimates are recorded, who records the deviation, and when it is recorded.
- The tracking record checks whether every closed phase has a deviation row.
- The estimate and deviation go on the baseline.
Plan
| Where the estimate is recorded | Who records the deviation | When it is recorded |
|---|---|---|
| No record yet | ||
This table has no record yet. The steps in this section say how to fill it. Register this table
Tracking record
| Phase | Deviation row present | Deviation |
|---|---|---|
| No record yet | ||
This table has no record yet. The steps in this section say how to fill it. Register this table
Baseline
| Estimate and deviation | Baseline identifier |
|---|---|
| No record yet | |
This table has no record yet. The steps in this section say how to fill it. Register this table
3
- Write the procedure for phase estimates, one entry at a time, including the completion criterion.
- For each entry, write how this item implements it.
- A nonconformity is its own row. A change to the procedure or to the implementation is another row, with its configuration identifier.
- The procedure and the conformity comparison share one configuration identifier.
Conformity comparison
| Procedure entry | Implementation on this item | Conformity | Identifier of the comparison |
|---|---|---|---|
| No record yet | |||
This table has no record yet. The steps in this section say how to fill it. Register this table
4
- Measurement comes from MAN.6. MAN.6 is outside this pass, so the table below stays blank.
- Before the work, write the expected result of phase estimates.
- After the work, write the actual result.
- When the result drifts, write the adjustment and its configuration identifier.
- A product-gate result is not entered in this table.
Process measurement
| Expected result | Actual result | Drift | Identifier of the adjustment |
|---|---|---|---|
| — | — | — | — |
The cells stay blank. Process measurement comes from MAN.6, which is outside this pass. Register this table
5
- Take one drift from the level-4 process measurement.
- Change the procedure entry that corresponds to that drift.
- Name the measurement the change rests on.
- The changed procedure stays on the baseline and cites that measurement.
Procedure change
| Procedure entry changed | Measurement | Change | Identifier of the change |
|---|---|---|---|
| — | — | — | — |
The cells stay blank. Level 4 has no measurement, so this level has no record to rest on. Register this table