中文

FuSa dossier · requirements

Platform requirements

A PR becomes an FSR, then a software requirement already under test. Every ASIL is TBD. Evidence status stays on the trace. This table does not copy pass or fail.

SG-01SG-02SG-03SG-04SG-05

PRPlatform requirementFSRElementSGSSR
PR-01After a critical process exits, supervision stays visible, and the platform restarts or degradesDetect the abnormal exit and restart or degrade, so supervision is not lost in silenceEM / OSALSG-01SR-01.1…01.4
PR-02Alive / Deadline misses are detected in the window; health returns; a bypass can keep runningDetect Alive and Deadline misses in the configured window and clear them on recoveryPHMSG-02SR-02.1…02.5
PR-03A function group accepts only legal transitions; a health fault can reach state managementReject illegal transitions and notify SMSMSG-03SR-03.1…03.5
PR-04Platform fault events stay in a local ring and can be read laterWrite platform fault events into a readable local ringCollectorSG-04SR-04.1…04.4
PR-05A production profile can turn the debug path off without the main chain depending on host toolsTurn the debug path off under production-release and still verify the main chaincompose profileSG-05SR-05.1…05.2

Decomposition rules live in the checker, not pre-split in this table. The original ASIL and the independence argument wait until upstream gives a parent ASIL.