Automotive SPICE 4.0 · Process trace

SUP.10 · Change request

This stands at 0. The next step is a change request, approved before the change reaches main. The trace already here: Commits on main

Back to the assessment · Register

0 1 2 3 4 5

0 · Now

  1. Commits on main can be opened. The message states why. The diff states what changed.
  2. There is no change request, and no approval before the change reaches main.
  3. The purpose of this level is not achieved. The level is 0.

Change request

Change identifierChange requestApprovalIdentifier of the commit on main
No record yet

This table has no record yet. The next section is how to establish it. Register this table

1 · Next

  1. One change is one row. The change request states the content and the reason.
  2. The approval names who agreed that it may reach main. The approver is independent of the request author.
  3. A row without approval leaves the identifier of the commit on main blank.
  4. After the change reaches main, that identifier is written back on the row. The commit message matches this change request.

Change request

Change identifierChange requestApprovalIdentifier of the commit on main
No record yet

This table has no record yet. The steps in this section say how to fill it. Register this table

2

  1. The change-control plan names where requests are recorded, who may approve, and the constraint that applies before approval.
  2. The tracking record checks whether every commit that reached main already had an approval.
  3. A change request that matches goes on the baseline.

Change-control plan

Where the request is recordedWho may approveConstraint before approval
No record yet

This table has no record yet. The steps in this section say how to fill it. Register this table

Tracking record

Identifier on mainApproval came firstMatching change request
No record yet

This table has no record yet. The steps in this section say how to fill it. Register this table

Baseline

Change requestBaseline identifier
No record yet

This table has no record yet. The steps in this section say how to fill it. Register this table

3

  1. Write the procedure for change requests, one entry at a time, including the completion criterion.
  2. For each entry, write how this item implements it.
  3. A nonconformity is its own row. A change to the procedure or to the implementation is another row, with its configuration identifier.
  4. The procedure and the conformity comparison share one configuration identifier.

Conformity comparison

Procedure entryImplementation on this itemConformityIdentifier of the comparison
No record yet

This table has no record yet. The steps in this section say how to fill it. Register this table

4

  1. Measurement comes from MAN.6. MAN.6 is outside this pass, so the table below stays blank.
  2. Before the work, write the expected result of change requests.
  3. After the work, write the actual result.
  4. When the result drifts, write the adjustment and its configuration identifier.
  5. A product-gate result is not entered in this table.

Process measurement

Expected resultActual resultDriftIdentifier of the adjustment
————

The cells stay blank. Process measurement comes from MAN.6, which is outside this pass. Register this table

5

  1. Take one drift from the level-4 process measurement.
  2. Change the procedure entry that corresponds to that drift.
  3. Name the measurement the change rests on.
  4. The changed procedure stays on the baseline and cites that measurement.

Procedure change

Procedure entry changedMeasurementChangeIdentifier of the change
————

The cells stay blank. Level 4 has no measurement, so this level has no record to rest on. Register this table