中文

FuSa dossier · SIL

Integration scenes

Run again after the piece is in the main chain. Scenes on the debug path are not on this chain. A snapshot date is written only where a record exists.

SG-01SG-02SG-03SG-04SG-05

Scenes hung on a requirement

SceneServesHow to runExpectedConclusion
SIL-EM-01 SR-01.2 ctest -R gf_exec_em_smoke. A soft restart when no daemon is hosted The soft restart in EM-03 / EM-04 holds Pass, 2026-07-31, with L1. No separate timing. ISO-EM-02
SIL-EM-02 SR-01.3 · SR-01.4 smoke_sil_em_daemon.sh. Relaunch after exit 75 The log shows relaunch and em os_restart_exit; the gateway still receives a trajectory Pass, 2026-07-31. 0 ms / 1 ms. Detection time · ISO-EM-01
SIL-03 SR-02.5 smoke_sil_phm_fault.sh. GF_PHM_FAULT_MS=500 The planning log contains the miss and recovered; the gateway still has a trajectory Pass, 2026-07-31. Detect 287 ms, recover 20 ms. ISO-PHM-01
SIL-SM-01 SR-03.5 · SR-04.4 smoke_sil_sm_fg.sh. Target process fcm, shared Collector The log contains miss, health_fault, and a collector event Refresh with SIL. AFC has no USS. Not run with the main-chain trajectory. ISO-SM-02
SIL-T4 SR-05.1 · SR-05.2 GF_FUSA_T4=1 bash fusa/scripts/run_cases.sh The debug path is off; main-chain verification still passes; vehicle-debug is restored on exit Required on release. The goals page still marks this open

They support the main chain and are not hung on one SR

SceneHow to runExpectedConclusion
SIL-01smoke_sil.shThe build and the iceoryx demo passPass, 2026-07-31. Does not prove one SR
SIL-02smoke_sil_verify.shA bounded trajectory, plus exec / phm assertionsPass, 2026-07-31. SIL-T4 runs this again under the production profile
SIL-06smoke_mcu_desktop.shDesktop cross_domain_ipc passesPass, 2026-07-31. Not hung on SG-01…05