Automotive SPICE 4.0 · Process trace

MAN.5 · Risk management

This stands at 0. The next step is a risk record with an owner and the object of the next review. The trace already here: Five risks

Back to the assessment · Register

0 1 2 3 4 5

0 · Now

  1. The five risks and their treatments are written in the table below. The source is the reading page.
  2. There is no owner, and no object of the next review.
  3. The purpose of this level is not achieved. The level is 0.

Risk record

RiskTreatmentOwnerObject of the next reviewReview result
Three-stack complexityPlugins, Event firstNot assignedNot assignedNot assigned
Processes split too fineDecision table, colocated deploy allowedNot assignedNot assignedNot assigned
OEM noiseHuman review of the mapping, plus lintNot assignedNot assignedNot assigned
Diagram and code driftTools read SOR only, CI checksNot assignedNot assignedNot assigned
A multi-repo split too earlyMonorepo firstNot assignedNot assignedNot assigned

The risk and the treatment come from the reading page. The owner, the object of the next review, and the review result are not assigned. The purpose of this level is not achieved. Register this table

1 · Next

  1. The five rows are in the table below. The risk and the treatment are filled from the reading page.
  2. The owner is the role for that risk.
  3. The object of the next review states what will be looked at and where the result will be recorded. A date is added when it is set.
  4. After the review, the result is appended on the same row: the treatment still holds, or it needs a change. The earlier content stays.

Risk record

RiskTreatmentOwnerObject of the next reviewReview result
Three-stack complexityPlugins, Event firstNot assignedNot assignedNot assigned
Processes split too fineDecision table, colocated deploy allowedNot assignedNot assignedNot assigned
OEM noiseHuman review of the mapping, plus lintNot assignedNot assignedNot assigned
Diagram and code driftTools read SOR only, CI checksNot assignedNot assignedNot assigned
A multi-repo split too earlyMonorepo firstNot assignedNot assignedNot assigned

The risk and the treatment are filled. The owner, the object of the next review, and the review result are not assigned, so this table is not yet complete. Register this table

2

  1. The review plan states the condition under which each risk must be reviewed again.
  2. The tracking record states whether a row that should have been reviewed was reviewed, and whether the result was recorded.
  3. The risk record goes on the baseline.

Review plan

RiskReview conditionOwner
No record yet

This table has no record yet. The steps in this section say how to fill it. Register this table

Tracking record

RiskReviewed when requiredResult recorded
No record yet

This table has no record yet. The steps in this section say how to fill it. Register this table

Baseline

Risk recordBaseline identifier
No record yet

This table has no record yet. The steps in this section say how to fill it. Register this table

3

  1. Write the procedure for risk reviews, one entry at a time, including the completion criterion.
  2. For each entry, write how this item implements it.
  3. A nonconformity is its own row. A change to the procedure or to the implementation is another row, with its configuration identifier.
  4. The procedure and the conformity comparison share one configuration identifier.

Conformity comparison

Procedure entryImplementation on this itemConformityIdentifier of the comparison
No record yet

This table has no record yet. The steps in this section say how to fill it. Register this table

4

  1. Measurement comes from MAN.6. MAN.6 is outside this pass, so the table below stays blank.
  2. Before the work, write the expected result of risk reviews.
  3. After the work, write the actual result.
  4. When the result drifts, write the adjustment and its configuration identifier.
  5. A product-gate result is not entered in this table.

Process measurement

Expected resultActual resultDriftIdentifier of the adjustment
————

The cells stay blank. Process measurement comes from MAN.6, which is outside this pass. Register this table

5

  1. Take one drift from the level-4 process measurement.
  2. Change the procedure entry that corresponds to that drift.
  3. Name the measurement the change rests on.
  4. The changed procedure stays on the baseline and cites that measurement.

Procedure change

Procedure entry changedMeasurementChangeIdentifier of the change
————

The cells stay blank. Level 4 has no measurement, so this level has no record to rest on. Register this table