FuSa dossier · PHM cases
Supervision
Library cases for Alive, Deadline, and Logical. Where there is no integration scene, the chain stops here.
| Case | Serves | Precondition | Step | Expected | Conclusion |
|---|---|---|---|---|---|
| PHM-01 | SR-02.1 | Configure 50/80 | Evaluate with no Alive | AliveMissed | Matrix coverage. Stops at the library |
| PHM-02 | SR-02.2 | ReportAlive | Evaluate inside the window | Ok, and IsWithinDeadline | Matrix coverage, no separate timing |
| PHM-03 | SR-02.2 | Sleep past the deadline | Evaluate, then Alive again | DeadlineMissed, then Ok | Matrix coverage, no separate timing |
| PHM-04 | SR-02.3 | None | ReportLogical false, then true | LogicalFault, then Ok | Matrix coverage, no separate timing |
| PHM-05 | SR-02.4 | SetPaused | Sleep past the deadline | Still Ok | Matrix coverage, no separate timing |
Reproduce: ctest -R gf_phm_alive_deadline_smoke