FuSa dossier · upstream HARA

Upstream HARA

The vehicle hazard analysis stays with the upstream item owner. This repository supplies platform evidence. It does not fill S / E / C here, and it does not write a drill ASIL into a safety goal.

Who writes, who uses

Upstream HARAThis item
RoleVehicle / function itemSEooC (ISO 26262-10)
OwnerOEM or the functional-safety leadThis repository
Work productSituations, hazardous events, S/E/C, safety goals, ASIL, safe state, FTTIPlatform requirements, software safety requirements, detection time, isolation
NowAnother volume, assumption A-06SG-01…05 have an intent; ASIL stays TBD

Handed to this item

FieldUse
Safety-goal statementAlign or extend an SG
ASILWritten onto the SG, then inherited or decomposed along PR → FSR → SR
Safe stateWhere degrade, restart, or a rejected transition must land
FTTIThe ceiling for detection time, compared with detection time

Until that allocation arrives, detection time is compared only with the host SIL budget. That column is an engineering gate, not an FTTI, and not a board limit (assumption A-07).

Handed back

The integrator cites these in the vehicle safety case. A page drill is not a HARA conclusion.

Handed backWhere
PR-01…05 and the FSRsRequirements
SG → SR → L1/L3Trace
Isolation scenariosIsolation
Detection-time snapshotDetection time

Random hardware faults do not come from the HARA page. They go through hardware.