FuSa dossier · safety goals
Safety goals
Candidate goals for the platform. The ASIL column stays TBD until upstream allocates one. Identifiers line up with the requirements and the trace.
| SG | Intent | ASIL | SR | Evidence |
|---|---|---|---|---|
| SG-01 | After a critical process exits, the platform can detect it and restart or degrade, without losing supervision in silence | TBD | SR-01.1…01.4 | EM · SIL-EM-02 · ISO-EM-01 |
| SG-02 | Alive / Deadline misses are detected inside the configured window and health returns after recovery; a bypass can keep running while a fault is isolated | TBD | SR-02.1…02.5 | PHM · SIL-03 · ISO-PHM-01 |
| SG-03 | Illegal function-group transitions are rejected, and a health fault can be notified to SM | TBD | SR-03.1…03.5 | SM · ISO-SM-01 |
| SG-04 | Platform fault events are recorded by Collector in a local ring, for later analysis | TBD | SR-04.1…04.4 | COLL |
| SG-05 | A production profile can turn the debug path off, and the main chain does not depend on host tools | TBD | SR-05.1…05.2 | open · SIL-T4 |
Coverage
| SG | L1 | L3 fusa | Isolation | Note |
|---|---|---|---|---|
| SG-01 | yes | yes | yes | Relaunch measured; SIL budget ≤ 50 ms |
| SG-02 | yes | yes | yes | Detect and recover measured |
| SG-03 | yes | SIL-SM-01 | yes | |
| SG-04 | COLL-X* | with SIL-SM-01 | yes | Shared NDJSON store |
| SG-05 | L2 | SIL-T4 | — | GF_FUSA_T4=1 |
Not in this stage
- Correctness of perception or planning.
- Vehicle lateral or longitudinal ASIL allocation.
- Tool-qualification conclusions and a signed certificate.
- Treating GMT, Inject, or Tag→MCAP as board-level ASIL evidence.