FuSa dossier · assumptions
Assumptions of use
If these assumptions are not met, evidence in this repository cannot be read as a vehicle ASIL conclusion.
| ID | Assumption | Affects | Status |
|---|---|---|---|
| A-01 | The target provides clock, process, and storage primitives that meet the OSAL contract. SIL approximates them with host POSIX. The board is retested | SG-01 · SG-02 · SG-04 | open |
| A-02 | The chosen communication binding is deployed with its quota | Supporting chain | open |
| A-03 | Applications join as a process or a library, only through service-name pub/sub, and do not bypass the EM topology | SG-01 | open |
| A-04 | SIL evidence is reproduced on the same compose output. A config drift means a rerun | All | In demo |
| A-05 | The debug path can be turned off in production-release and is not in the default evidence set | SG-05 | In demo |
| A-06 | The certificate, tool qualification, vehicle HARA, and hardware FMEDA body are completed in the project safety process | All | open |
| A-07 | Board soak, stacked faults, and power-loss retention are out of the current evidence. Desktop SIL is not an ECU limit | SG-01…04 | open |
| A-08 | Without DoIP, CAN ISO-TP stays on the MCU. This platform hands over a complete UDS PDU | Diagnostics | In demo |